One Record From Bid to Closeout: Connecting Estimating, CRM, Field and Accounting

A contractor runs four systems that each hold part of the same job. Here is which system should own which fact, where the handoffs break, and what connecting them actually involves.

Follow one job through a contracting business and count the times somebody retypes something.

The invitation arrives in email. The estimate is built in takeoff software. The bid is tracked in a spreadsheet or a CRM. The won job is entered again in a project system. The crew is scheduled somewhere else. The pay application is built in accounting from numbers that came from the field by text message.

Six systems, one job, and a person at every seam. That is where the margin goes, and it does not show up as a line item anywhere.

Which system should own which fact?

The unification question is not "one system for everything". It is "which system is authoritative for each fact, and how does everything else find out".

FactSystem of recordWho needs a copy
Quantities, unit costs, the estimateEstimating softwareCRM, as a deal value
The relationship, the bid pipeline, win historyCRMNobody downstream
The job, the crew, dispatch, field statusField or project systemCRM, as status
Project schedule and critical pathProject managementField, as this week's work
Contract value, SOV, retainage, cost to dateAccountingProject, as budget
Drawings, submittals, RFIsDocument systemField, read only

Most integration projects fail because this table was never agreed. Two systems both think they own the contract value, they disagree, and people stop believing either.

Where do the handoffs actually break?

Estimate to CRM

Usually manual, and usually fine. The failure is not the typing, it is that nobody owns it, so half the bids have no value on the record and win rate reporting is fiction.

Won bid to job

The expensive one. Somebody rebuilds the job in a second system from the estimate, and the scope detail that decided the number does not survive the retyping. This is the seam worth closing first in most contracting businesses.

Field to accounting

Quantities complete, hours, materials. When this runs on text messages and memory, billing is late and job cost is a guess until closeout. By then the job is over and the lesson is unlearnable.

Change orders, everywhere

A change is agreed in the field, priced in the office, approved by the owner and billed in accounting. Four systems, four opportunities to lose it. Work that gets done and never billed is the purest form of this problem.

What does connecting them involve?

Three mechanisms, in increasing order of cost. Most contractors need the middle one and buy the expensive one.

How HubSpot and ServiceIQ fit

HubSpot is the system of record for the relationship, the bid pipeline and the history. ServiceIQ is the system of record for the job: dispatch, crews, document management and, at its Enterprise tier, the pay application. They connect with a native two-way sync, which is the seam described above as the expensive one: won bid becomes a scheduled job without anyone retyping it.

That still leaves estimating, project scheduling and the ledger where they are, and it should. Those are connected, not replaced.

Where to start

Not with a platform decision. Follow one job end to end and write down every point where a person moves information between systems. Mark which of those cost you money when they go wrong. The most expensive one is your first integration, and it is usually won bid to scheduled job.

Related: what each system does not do.

Knowledge Base